How many new jobs you get
Set a rolling seven-day limit for new planned work without losing the work already on your list.
Last updated 3 November 2026
Grovekeeper keeps the plan manageable. In Settings, New jobs per week is the maximum new work added in any rolling seven-day period, including retries. It defaults to three and can be set from one to ten.
Existing work stays visible
A fresh planning run does not mean a fresh quota. Existing matching jobs are reused and do not spend another new-job slot. Work that needs your approval can remain waiting rather than being silently added beyond your limit.
- 1Open Settings.
- 2Find New jobs per week in the garden’s fields.
- 3Choose a number you can realistically work through and save the garden.
This limit governs new work proposed by the grower. Jobs you add yourself remain under your control. Reducing the number does not delete existing records.
Plan access and the free planning allowance are separate from the job limit. See plans and limits.